Albion Pedestrian Trail Bridge Replacement

YEAR
2014
LOCATION
Pitt Meadows, BC
Client
Maple Ridge Pitt Meadows Parks and Leisure Services
CONSULTANT
Lang Structural Engineering Inc.
DELIVERY METHOD
Design Build
COnstruction Value
$50,000

Purpose

Replace existing compromised pedestrian bridge with new bridge complete with railings and approaches.    

Components

Yellow cedar glulam main beams with western red cedar railings and deck.  Approaches constructed with basalt slabs designed to fit in with the natural surroundings with minimal environmental impact and give a long-lasting maintenance free product.

Albion Pedestrian Trail Bridge Replacement

YEAR
2014
LOCATION
Pitt Meadows, BC
Client
Maple Ridge Pitt Meadows Parks and Leisure Services
CONSULTANT
Lang Structural Engineering Inc.
DELIVERY METHOD
Design Build
COnstruction Value
$50,000

Purpose

Replace existing compromised pedestrian bridge with new bridge complete with railings and approaches.    

Components

Yellow cedar glulam main beams with western red cedar railings and deck.  Approaches constructed with basalt slabs designed to fit in with the natural surroundings with minimal environmental impact and give a long-lasting maintenance free product.