Albion Pedestrian Trail Bridge Replacement

Purpose
Replace existing compromised pedestrian bridge with new bridge complete with railings and approaches.
Components
Yellow cedar glulam main beams with western red cedar railings and deck. Approaches constructed with basalt slabs designed to fit in with the natural surroundings with minimal environmental impact and give a long-lasting maintenance free product.
Albion Pedestrian Trail Bridge Replacement
Purpose
Replace existing compromised pedestrian bridge with new bridge complete with railings and approaches.
Components
Yellow cedar glulam main beams with western red cedar railings and deck. Approaches constructed with basalt slabs designed to fit in with the natural surroundings with minimal environmental impact and give a long-lasting maintenance free product.


