Waterfront Esplanade Boardwalk Reconstruction

YEAR
2023
LOCATION
New Westminster, BC
Client
City of New Westminster
CONSULTANT
Parsons Engineering
DELIVERY METHOD
General Contract
COnstruction Value
$850,000

Purpose

Ongoing maintenance of ageing wooden esplanade.

Components

Replace existing pile caps minimizing disturbance to existing structure, add cross bracing, install pile postings and banding, and address two sink holes along promenade.  This work was all completed working above and beside the Fraser River in a tidal area.  Work was timed and planned around the tides.  Pedestrian traffic was diverted around the construction areas but never disrupted.

Waterfront Esplanade Boardwalk Reconstruction

YEAR
2023
LOCATION
New Westminster, BC
Client
City of New Westminster
CONSULTANT
Parsons Engineering
DELIVERY METHOD
General Contract
COnstruction Value
$850,000

Purpose

Ongoing maintenance of ageing wooden esplanade.

Components

Replace existing pile caps minimizing disturbance to existing structure, add cross bracing, install pile postings and banding, and address two sink holes along promenade.  This work was all completed working above and beside the Fraser River in a tidal area.  Work was timed and planned around the tides.  Pedestrian traffic was diverted around the construction areas but never disrupted.