Kensington Complex Ice Melt Pit
Purpose
The existing ice rink required to store the ice “snow” after each flooding on the out side pavement. Owners desired to install a heated pit inside the facility to melt the ice quickly.
Components
Interior excavation and shoring to install a new poured in place concrete pit. New heating plumbing line and controls and drainage
Kensington Complex Ice Melt Pit

Purpose
The existing ice rink required to store the ice “snow” after each flooding on the out side pavement. Owners desired to install a heated pit inside the facility to melt the ice quickly.
Components
Interior excavation and shoring to install a new poured in place concrete pit. New heating plumbing line and controls and drainage





