Peter Ewart Middle School Seismic Upgrade

Purpose
To complete a seismic upgrade to the existing school.
Components
Fricia completed all forming, epoxy dowel installation, rebar installation pouring and placing concrete. The upgrade included new footing and shear walls connected to existing the existing footings. New two-story concrete shear wall poured through the floor in existing school, two story exterior shotcrete shear wall. The work included approximately 400m3 concrete poured in an existing school, 5000 epoxied connections to existing concrete.
Peter Ewart Middle School Seismic Upgrade
Purpose
To complete a seismic upgrade to the existing school.
Components
Fricia completed all forming, epoxy dowel installation, rebar installation pouring and placing concrete. The upgrade included new footing and shear walls connected to existing the existing footings. New two-story concrete shear wall poured through the floor in existing school, two story exterior shotcrete shear wall. The work included approximately 400m3 concrete poured in an existing school, 5000 epoxied connections to existing concrete.